Two-Seat Hard Chamber at a Wellness Club
A 240V two-seat hard chamber beside a VIP lounge, with floor loading and ventilation preparation.

A wellness club installed a two-seat hard chamber next to its VIP lounge for member-booked relaxation sessions. Before installation the supplier provided a checklist covering floor loading, ventilation and power requirements.
The site reserved a dedicated 240V circuit and floor drain; the chamber sits on a load-bearing floor with clearance for heat dissipation and servicing. Commissioning covered air-tightness testing, oxygen generator operation and control system checks.
Operation notes are printed on cards beside the chamber, and staff explain the procedure before a member first session. Interior lighting and seating were customized to match the lounge style.
Six months on, the club replaces filters according to the maintenance sheet and records running hours; equipment status remains stable.